A quality manager checking a supplier’s technical file recently came across one of the legacy MDD certificates still in circulation: a CE certificate issued under the old Medical Device Directive in 2019, already past its printed expiry date. The device was still legally on the EU market. That is the first thing to understand about legacy MDD certificates: Regulation (EU) 2023/607 kept them valid well beyond the original 26 May 2024 cut-off, but only for devices that keep meeting a specific set of conditions, and on two different deadlines depending on risk class.
Why legacy MDD certificates can still be valid today
The MDR (Regulation (EU) 2017/745) defines a «legacy device» as one lawfully placed on the market under the old Medical Device Directive 93/42/EEC or the Active Implantable Medical Device Directive 90/385/EEC, holding a valid certificate on 26 May 2021. Article 120 of the MDR let these devices stay on the market while their manufacturers migrated to MDR certification, originally until 26 May 2024. When notified body capacity turned out to be far short of what thousands of pending applications needed, Regulation (EU) 2023/607 extended that window again, splitting it into two dates that depend on how risky the device is. The practical effect is that a certificate stamped «93/42/EEC» is not, by itself, evidence of anything out of date — it is the conditions behind it that decide whether the device is still legally on the market. A second, narrower category of legacy device also exists under Article 120(3b) MDR: Class I devices whose MDD conformity assessment did not require a notified body, whose declaration of conformity was drawn up before 26 May 2021, but whose assessment under the MDR does require one. These devices hold no certificate at all — what has to be checked is the date on the declaration of conformity and the written notified body agreement, not a certificate — and Article 120(3b) sets their deadline at 31 December 2028, provided they meet the same conditions set out in Article 120(3c).
The two deadlines: 31 December 2027 and 31 December 2028
Class III devices and implantable Class IIb devices fall under the earlier date, 31 December 2027, with one notable carve-out: a list of well-established implant technologies — sutures, staples, dental fillings, braces, crowns, screws, wedges, plates, wires, pins, clips and connectors — was moved to the later deadline instead, because the risk associated with them is considered lower in practice than their formal classification suggests. Everything else in Class IIb, plus Class IIa devices and the Class I devices placed on the market in a sterile condition or with a measuring function (the «Is»/»Im» sub-categories, which remain Class I under both the MDD and the MDR but have always required limited notified body involvement for those specific aspects), run until 31 December 2028. The Article 120(3b) category described above — Class I devices moving from no notified body involvement under the MDD to needing one under the MDR — falls under that same 2028 date. A third, narrower track applies to custom-made Class III implantable devices: under Article 120(3f), these could defer MDR certification until 26 May 2026 — a date that, as of this writing, has already passed, which means any custom-made implant still relying on that route needs an honest look at its current status rather than an assumption that the old paperwork still carries it.
What keeps legacy MDD certificates inside the extension — and what pushes them out
None of this is unconditional. A device keeps its legacy status only if its design and intended purpose have not changed significantly since 26 May 2021 — a new patient population, a materially different architecture or a new intended use are exactly the kind of change that the European Commission’s own guidance on Article 120 treats as ending the extension on the spot, independent of any paperwork deadline. On top of that, by 26 May 2024 the manufacturer had to have a quality management system in place under MDR Article 10(9) and a formal application lodged with an MDR-designated notified body; by 26 September 2024, that application had to become a signed written agreement with the notified body. A manufacturer that missed either date lost the extension regardless of device class — the 2027 and 2028 deadlines only apply to devices that cleared those two earlier gates. One detail worth knowing: the amendment also deleted the old «sell-off» rule, so stock legitimately placed on the market before the applicable deadline can keep being distributed afterwards without a separate expiry date of its own.
Why this matters if you import or distribute, not just if you manufacture
In our experience, the operators who get caught out are rarely the manufacturers — they tend to know exactly where their notified body file stands. It is importers, distributors and authorised representatives who assume an MDD certificate automatically means an obsolete device, or who assume the opposite: that any certificate still showing a printed validity date is still valid in law. Neither assumption is safe. Before taking on a device with a legacy certificate, ask the manufacturer directly for the evidence of the 2024 notified body application and agreement, not just the certificate itself, and check the device’s entry and the notified body’s current status in EUDAMED, since a withdrawn, suspended or limited notified body designation can put the extension at risk even if nobody has updated the paper certificate yet; Article 46 MDR keeps certificates valid only in defined cases, so the file should record which one applies. For devices entering Spain specifically, that check sits alongside the usual AEMPS import licence paperwork, not instead of it — a legacy MDD certificate satisfies the device’s own conformity status, it does not replace the importer’s own obligations.
If you are the one preparing or reviewing the technical documentation for the eventual MDR submission, build the file now rather than at the deadline. A notified body queue that is already stretched for in-vitro diagnostics, as the parallel IVDR legacy device deadline showed when it quietly passed in September 2026, is not going to move faster for medical devices once 2027 arrives. The manufacturers who started their notified body application in 2024, when the rule first demanded it, are the ones who will have a working MDR certificate by the time their legacy one runs out; the ones who treated the 2027 or 2028 date as the start of the process, rather than its end, are the ones whose devices will disappear from the shelf.
Frequently asked questions
Do legacy MDD certificates need to be renewed before 2027 or 2028?
No. The extension under Article 120 applies by operation of law to devices that meet the conditions; manufacturers do not apply for a new MDD certificate, because the MDD no longer exists as a certification route. What they needed to do, by the 2024 dates, was start and formalise the MDR application with a notified body — the 2027/2028 dates are when that MDR certificate must actually be in place.
What happens to a device that does not make either deadline?
It can no longer be placed on the market or put into service once its applicable date passes, and an importer holding stock without a valid MDR certificate or a current legacy status should treat it as non-compliant rather than wait for a customs or market-surveillance inspection to confirm it.
Does losing the notified body designation affect devices that already met the 2024 conditions?
It can. The extension is tied to a specific notified body relationship, not just to the manufacturer having applied somewhere. What happens next depends on which Article 46 MDR scenario applies: if the notified body’s designation is withdrawn, certificates can remain valid for nine months — extendable in three-month increments up to twelve months in total — but only if the competent authority confirms there is no associated safety issue and another notified body confirms in writing that it is taking over immediate responsibility (Article 46(9)). If the designation is only suspended or limited instead, certificates can keep their validity under the narrower conditions of Article 46(8). The Regulation does not expressly say whether that safeguard also covers the written agreement a manufacturer signed under Article 120, so this needs confirming with the competent authority and the new notified body before anyone relies on it. Outside those conditions, the manufacturer needs a new notified body and, in most cases, a new application to keep the device on the market.
If your company imports, distributes or manufactures a device still carrying an MDD or AIMDD certificate, the practical question is not which deadline applies on paper — it is whether the conditions behind it are still being met today. Our medical devices team can review the notified body file, the EUDAMED entry and the technical documentation behind a specific device and tell you, in writing, where it actually stands. Get in touch before the 2027 deadline becomes a shipment held at customs.